Nogales, AZ Comm-min

Nogales, AZ Communication Site

A. Install New HVAC Cabinet

  • Identify the installation location.
  • Ensure proper leveling and securing of the cabinet.

B. Run Power Grid Power Panel

  • Follow electrical safety protocols.
  • Route power cable to the HVAC enclosure.

C. Install Electrical Power to Circuit Breaker Panel

  • Connect wiring according to local electrical codes.
  • Ensure proper labeling and securing of connections.

D. Install Security Fence

  • Mark the perimeter for the fence.
  • Ensure two door openings for access.
  • Secure the fence properly to prevent unauthorized access.

E. Install Fiber Optic Cable

  • Route fiber optic cable from hand hole to HVAC cabinet.
  • Ensure protection against physical damage.

F. Testing Fiber Optic Cable

  • Perform pre-installation testing.
  • Document results.
  • Conduct post-installation testing and splicing.

G. Install Cat 6 Ethernet Cable

  • Route cable from HVAC unit to Tower.