
Nogales, AZ Communication Site
A. Install New HVAC Cabinet
- Identify the installation location.
- Ensure proper leveling and securing of the cabinet.
B. Run Power Grid Power Panel
- Follow electrical safety protocols.
- Route power cable to the HVAC enclosure.
C. Install Electrical Power to Circuit Breaker Panel
- Connect wiring according to local electrical codes.
- Ensure proper labeling and securing of connections.
D. Install Security Fence
- Mark the perimeter for the fence.
- Ensure two door openings for access.
- Secure the fence properly to prevent unauthorized access.
E. Install Fiber Optic Cable
- Route fiber optic cable from hand hole to HVAC cabinet.
- Ensure protection against physical damage.
F. Testing Fiber Optic Cable
- Perform pre-installation testing.
- Document results.
- Conduct post-installation testing and splicing.
G. Install Cat 6 Ethernet Cable
- Route cable from HVAC unit to Tower.